WIS M&E ENGINEERING
54-G, Jalan Equine 1B, Taman Equine, 43300 Seri Kembangan, Selangor, Malaysia.
+6012-6941541
+6012-6941522
+6012-6941522
Double Storey House at Sri Serdang
Previous | 1 / 6 | Next |
Constructing a domestic cold water system for a double-story house requires careful planning and execution to ensure a reliable and efficient water supply for the entire property. This involves determining the water demand, sizing the pipes and fittings, and selecting the appropriate equipment and materials to meet the specific requirements of the house. The installation process involves laying out the pipes and fittings, connecting them to the main water supply line, and testing the system for any leaks or other issues.